
New Construction Plan Analysis
Building efficiently, healthy, and comfortable from the scratch makes it easy to achieve specific goals. The easiest way of achieving the most efficient building is during the design phase of a building.
Manual J Heat Load Calculations
Manual J calculations are used to correctly size HVAC systems. A Manual J calculation is imperative when building a new home or upgrading an existing home.
Far too often HVAC systems that are installed exceed the building? needs by 50 to 100 percent; this results in increased first cost and increases the utility bills over the life of the system.
For new construction a set of plans is all that is required to prepare a Manual J calculation; the need for existing buildings HVAC system upgrades can determined during an energy audit at which time the required building data will be collected on-site.
Green Building Inspections
Once plans have been drafted the goal is to ensure the construction team is properly installing everything. Some of the techniques incorporated into a ?reen building are still developing and as with everything there is a learning curve required to reach perfection. We offer construction management and inspection to help the process go smoothly. Each project will differ as will phases which require the most attention to detail. Pre-drywall inspections are usually quite important for all projects.